麻豆人妻无码性色AV专区,亚洲AV极品无码专区在线观看,18禁美女黄网站色大片在线,秋霞无码久久久精品,宅男噜噜噜66网站在线观看,真人无码作爱免费视频网站,中国亚州女人69内射少妇,丝袜美腿亚洲一区二区,少妇高潮无套内谢麻豆传,国产精品无码AV片在线观看播

<center id="ojlzu"></center>
<rt id="ojlzu"></rt>
    <rt id="ojlzu"></rt>
  1. <rt id="ojlzu"></rt>
      1. Wuxi Gotele Metal Products Co., Ltd : CN EN
        Home >>News >>News of Construction and Building

        Golden Gate Bridge: an Exceptional piece of Steel Engineering



        San Francisco’s Golden Gate Bridge is one of the most iconic bridges in the world. It is a so-called suspension bridge: the deck is supported by vertical cables attached to upper larger cables, which -in turn- extend between supporting towers and are anchored at the ends.


        The bridge’s construction begun in 1933 and gave chances of employment during the US’s Great Depression. The design was assigned to engineer Joseph Strauss. The constructions time took 4 years costing $35 million and featuring some extreme scenarios.


        For example, 3.25 million cubic feet (92,030 cubic metres) of soil excavations were required for establishing the bridge’s anchorages and they are 12-floors tall! The divers had to submerge as deep as 90 feet (27.4 m) in the water to explode rocks and then remove the debris! Despite such difficulties, the bridge finally opened in 1937.


        On-site construction of the suspension cables began in 1935. All the bridge’s cables are made of galvanized carbon steel wires and they were laid by a ‘spinning’ technique.


        The two main cables alone account for 61,500 tons of weight load on the two 746-ft-tall (227 m) towers! The wires pass on top of the towers and are secured at each end in massive anchorages. The main cables measure 36.22 inches in diameter and they extend for 7,650 ft (2,332 m) each!


        Such massive cables were manufactured by grouping together 61 bundles of wire. In turn, each of these is made up of 452 smaller wires, for a total of 27,572 cables! As for the vertical suspended cables, they tie the bridge’s deck to the main cables. There are 250 pairs of them; they are spaced 50 feet apart from each other and measure from 2 to 16 inches in diameter.  All of the vertical ropes were replaced between 1972 and 1976.


        It is interesting how the Golden Gate Bridge ‘dances’ up and down depending on the temperature. Hot days with high temperature cause the metal to expand; steel cables elongate and the bridge’s deck lowers. This is especially visible in its central part. Moreover, painting the ‘Red Bridge’ is a non-stop task and of primary importance. In fact, the paint applied to the steel prevents both corrosion and rust that the air with high salt content in may cause.


        At Wuxi Gotele Metal Corporation we are passionate about bridges engineering and infrastructure technologies. With the help of our experts we proudly supply products such as Steel Truss Bridge, Diagonal Span Arch Bridge and Compact Panel Bridge. For further information and a full list of products, please click here.

        HomeTelProductsContact
        CN EN
        国产微拍一区二区视频| 亚洲av中文乱码乱人伦在线| 在线观看无码AV网站永久免费| 成人国产一级二级三级| 最好看中文字幕一区二区| 精品久久久久久无码免费| 成人深夜福利av在线| 国产一区二区精品av| 国产毛茸茸的全黄视频| 夜色资源站WWW国产在线视频 | 中文字幕日韩极品在线看| 亚洲人成电影网站色WWW两男一女| 免费看日韩香蕉毛片视频| 国产免费观看久久av| 色草在线观看免费视频| 国产精品无码一二区免费| 各种虐奶头的视频无码| 人妻精品人妻一区二区三区| 少妇被粗大的猛进出视频的| 亚洲成人免费一级av| 亚洲精品国产一二三区| 馒头大胆亚洲一区二区| 香港三级精品三级在线专区| 人妻免费精品久久一区| 国产视频在线一区二区| 午夜av大片在线观看| 日本艳星一区二区三区| 中文熟妇人妻av在线| 欧美亚洲综合另类成人| 日韩一区中文字幕在线| 人妻熟妇一区二区视频| 亚洲精品无码久久久久APP| 亚洲熟女诱惑一区二区| 日韩精品人妻2022无码中文字幕 | 国产一级内射片在线播放| 国产精品黄色片在线观看| 国内少妇无套内射视频| 日本中文字幕有码高清| 欧美亚洲国产精品社区| 国产午夜视频看看果冻| 久久综合精品一区二区|